Workflow
山东电网负荷连续41天破亿千瓦,今年度夏第六次创下历史新高
Qi Lu Wan Bao Wang·2025-08-20 23:19

Core Insights - Shandong's power grid reached a record high load of 12.517 million kilowatts on August 20, marking the sixth historical peak this summer, with an increase of 10.65 million kilowatts compared to last year's highest load [1][2] - The sustained high temperatures and humidity have driven rapid growth in power load, with the grid load exceeding 10 million kilowatts for 41 consecutive days [1] - The Shandong Power Meteorological Innovation Center has implemented advanced weather modeling for load forecasting, achieving a prediction accuracy of 99.7% for load and 98% for renewable energy output [1] Power Supply and Generation - At the peak load moment, external power supply to Shandong reached 28.02 million kilowatts, while wind and solar energy combined output was 52.531 million kilowatts [2] - The total output from in-province direct adjustment units was 38.173 million kilowatts, and local power plants contributed 6.446 million kilowatts, showcasing significant collaborative support from diverse power sources [2] - Cumulative external power supply from July to August reached 37.9 billion kilowatt-hours, representing a year-on-year increase of 16%, with long-term external power supply exceeding 30 million kilowatts for the first time [2]