Dryden Gold Reports 8.68 g/t Gold over 9.40 Meters at Jubilee
Newsfile·2025-08-21 10:00

Core Insights - Dryden Gold Corp. is reporting positive results from its ongoing 2025 drill program on the Elora Gold System, particularly from the Jubilee Zone and Jubilee Hanging Wall [1][3] Drill Highlights - Drill hole DGR-25-016 intercepted 8.68 g/t gold over 9.40 meters, including high-grade intercepts of 20.50 g/t over 1.30 meters and 26.40 g/t over 1.40 meters [4][7] - Drill hole DGR-25-013 expanded the Jubilee Zone with 1.54 g/t gold over 10.35 meters, including 6.12 g/t over 1.30 meters [4][7] - The company has identified four gold-bearing hanging wall structures parallel to the Jubilee Zone [7] Jubilee Zone - The geology team is collaborating with experts to refine the controls of the highest-grade mineralization, which appears to be influenced by regional structural intersections [4] - The findings from Jubilee will inform targeting for high-grade zones in other areas of the Gold Rock Camp [4] Jubilee HW Zone - Follow-up drilling has confirmed multiple stacked structures in the hanging wall of the Jubilee Zone, with hole DGR-25-013 showing 3.41 g/t gold over 5.25 meters, including 8.01 g/t over 2.05 meters [5][7] - Additional results from holes DGR-25-013 and DGR-25-014 indicate promising mineralization in the hanging wall area [5] Drill Program Update - The current drilling program includes a focus on the Pearl Zone and Laurentian Mine area, with plans to test expansion targets between Pearl and Laurentian [6] - The company is also set to drill at the Mud Lake target, which has shown surface samples grading up to 24.20 g/t gold [6] Financing Update - Dryden Gold closed a financing of $7.8 million, which includes $5.95 million allocated for 2026 flow-through exploration funds [16] - The 2026 exploration program is expected to commence in October 2025, involving 20,000 meters of drilling [16]

Dryden Gold Reports 8.68 g/t Gold over 9.40 Meters at Jubilee - Reportify