中方与ITER组织成功签署重大现金任务协议
Zheng Quan Shi Bao Wang·2025-08-22 12:26

Core Viewpoint - The signing of the cash task agreement for the ITER magnet power supply phase II marks a significant step for China's involvement in the ITER project, beyond its physical contributions [1] Group 1: Agreement Details - The agreement was signed on August 19, 2025, between the China International Nuclear Fusion Energy Program Execution Center and the ITER organization [1] - This cash task agreement is a major commitment from China, in addition to its procurement package contributions to the ITER project [1] Group 2: Project Implementation - The ITER magnet power supply system provides variable power to superconducting coils, including the toroidal field coils, poloidal field coils, central solenoid coils, and correction field coils [1] - The power supply system is divided into two phases: phase I, which is handled by China and South Korea as a procurement package, and phase II, which will be integrated with phase I [1] Group 3: Consortium Involvement - The Chinese Academy of Sciences' Institute of Plasma Physics leads a consortium that includes five entities: Southwest Institute of Physics, Rongxin Huike Electric Co., China Nuclear Power Engineering Co., and China Nuclear Industry 23 Construction Co. [1] - The consortium is responsible for the design, prototype development, mass manufacturing, integration testing, and on-site installation and commissioning of various power supply equipment [1]

中方与ITER组织成功签署重大现金任务协议 - Reportify