Workflow
南通海门招商局邮轮制造有限公司制造基地项目5号码头工程开工
Yang Zi Wan Bao Wang·2025-08-25 14:08

Core Points - The construction of the terminal project for China Communications Construction Company (CCCC) at the China Merchants Heavy Industry Co., Ltd. manufacturing base has commenced, with a total length of 677 meters for the terminal structure [2] - The project aims to enhance the integrated development of the Yangtze River Delta and establish a comprehensive transportation system in Nantong, which includes sea transport, river-sea transfer, and rail-sea connectivity [4] Group 1 - The terminal platform measures 640 meters in length and 22 meters in width, with an additional bridge section of 37 meters in length [2] - The terminal will feature various berths, including a 20,000 GT small cruise ship outfitting berth, a 20,000-ton semi-submersible berth, and a 3,000-ton floating crane berth, along with supporting facilities for power, water, and gas [2] - The project is significant for promoting the scale effect of Nantong's hub economy, port economy, and new industrial base [4]