Workflow
长沙出台推进农村供水保障高质量发展实施方案
Chang Sha Wan Bao·2025-08-26 02:50

Core Viewpoint - The implementation plan for high-quality rural water supply development in Changsha from 2025 to 2030 aims to address urgent rural water supply issues and promote integrated urban-rural water supply development [1][2]. Group 1: Rural Water Supply Development - Changsha will focus on solving urgent rural water supply problems and enhance the capacity of rural water supply guarantees [1]. - The plan emphasizes the integration of rural water supply engineering with urban planning, promoting the extension of urban water supply networks to surrounding rural areas [1][2]. - A unified management mechanism for urban and rural water supply will be established to ensure coordinated operation, maintenance, and service [1]. Group 2: Engineering and Infrastructure - The plan outlines a scientific approach to planning large-scale centralized water supply projects in areas where urban water supply networks cannot be extended [2]. - Small-scale water supply projects will undergo comprehensive evaluation and standardization for construction and renovation [2]. - Measures such as network extension, new construction, or expansion of existing facilities will be implemented to address seasonal water shortages [2]. Group 3: Environmental Protection and Quality Assurance - Strengthening supervision of ecological protection at water source sites is mandated, along with the implementation of rural drinking water source protection [2]. - The plan requires the reasonable allocation and updating of purification and disinfection facilities based on the scale and water quality of rural water supply projects [2]. - Emphasis is placed on strict adherence to legal regulations throughout the project lifecycle to ensure quality and safety in rural water supply [2].