Workflow
“滚烫”安全检查,只为万家“清凉”
Nan Jing Ri Bao·2025-08-26 23:41

Core Insights - The article highlights the critical role of maritime personnel in ensuring the safe unloading of 50,000 tons of coal from the "Shengfan 6" ocean-going vessel at the Nanjing Datang Power Plant dock, emphasizing the importance of safety checks in high-temperature conditions [5][7]. Group 1: Operations and Safety Checks - Maritime personnel conducted thorough inspections of the vessel's deck, unloading equipment, and firefighting systems to ensure safe operations during the coal unloading process [5][7]. - The unloading operation involves two unloading machines working continuously for 40 to 50 hours to completely unload the coal, which is essential for maintaining the power supply to the city [7]. Group 2: Environmental Conditions - The unloading process occurs under extreme heat, with temperatures reaching 37°C on the dock and 52°C in the engine room, making the working conditions challenging for the crew and inspectors [6][7]. - The crew has been on a 9-day journey from Indonesia, facing difficult conditions at sea, including high winds and noise, which adds to the complexity of their task [6]. Group 3: Energy Supply Impact - The coal being unloaded is crucial for generating approximately 100 million kilowatt-hours of electricity, equivalent to the daily electricity consumption of Nanjing, highlighting the significance of this operation for the city's energy supply [7].