Core Viewpoint - The completion of the first phase of the Fao Port project in Iraq, a significant infrastructure initiative, is imminent, with the Iraqi government preparing to invite international operators for collaboration [1][2]. Group 1: Project Overview - The Fao Port, located at the southernmost point of Iraq, is set to become a world-class port with a capacity of nearly 100 million tons, with the first phase expected to operate this year and achieve an annual throughput of 45 million tons [1]. - The Iraqi government plans to invest $17 billion in constructing a railway and a highway connecting Fao Port directly to Turkey [1]. Group 2: Construction Progress - China Communications Construction Company Tianjin Dredging Bureau is responsible for the dredging of the port's berth, basin, and channel, with a total dredging volume of 10.6 million cubic meters [2]. - As of now, the berth has passed inspection, and the dredging of the basin and channel has reached 98% and 96% completion, respectively, with full completion expected in October [2]. Group 3: Strategic Importance - The Fao Port is not just a port but a crucial node for Iraq's participation in global trade and the Belt and Road Initiative [2]. - The Iraqi delegation has visited ports in China and the UAE to learn about operational experiences, aiming to apply these insights to the Fao Port [2].
中企参建伊拉克最大港口即将完工
人民网-国际频道 原创稿·2025-08-27 01:52