Workflow
中石化天津LNG接收站累计接卸600船
Zhong Guo Hua Gong Bao·2025-08-27 02:03

Core Viewpoint - The successful unloading of the "Hamara" LNG carrier at the Sinopec Tianjin LNG receiving station marks a significant milestone, being the 600th LNG shipment since its inception in February 2018, highlighting the station's operational efficiency and contribution to energy supply stability in the region [1] Group 1: Operational Achievements - The Tianjin LNG receiving station has achieved a cumulative unloading volume of 41 million tons of LNG, resulting in over 48 billion cubic meters of natural gas being vaporized and supplied [1] - The station has contributed to a reduction of over 66 million tons of carbon dioxide emissions, showcasing its environmental impact [1] Group 2: Infrastructure and Capacity - The annual unloading capacity of the Tianjin LNG receiving station is 10.8 million tons, with a total gas storage capacity of 1.08 billion cubic meters, positioning it among the leading LNG receiving stations in China [1] - In November 2024, Sinopec plans to launch China's first cold and heat energy exchange station in the Nankou Industrial Zone, marking a significant advancement in energy coupling between LNG receiving stations and large-scale petrochemical production facilities [1] Group 3: Operational Innovations - The station implemented a "dual-ship in port" unloading operation during the summer peak energy usage, enhancing the efficiency of LNG transport vessel clearance and unloading turnaround times [1]