Core Viewpoint - The company conducted a fire emergency drill to enhance the emergency response capabilities of its mining rescue team, aligning with national safety production and emergency management policies [1][2]. Group 1: Emergency Drill Overview - The drill was designed around a simulated fire incident in the coal transportation system of a power plant, covering the entire response chain from fire detection to post-incident management [1]. - The drill commenced at 9 AM with the activation of smoke simulation devices, leading to immediate action by the power plant's control room personnel [1]. Group 2: Response Actions - Under unified command, rescue forces implemented a "control first, eliminate later" strategy, dividing into three teams to tackle the fire [2]. - The power plant's emergency team used fixed firefighting equipment to cover the burning conveyor belt with foam, while the mining rescue team employed mobile water cannons to cool high-temperature areas [2]. Group 3: Outcomes and Future Plans - The fire was completely extinguished within 45 minutes, with environmental monitoring indicating that all pollutant levels were within acceptable limits, marking the drill a success [2]. - The company aims to continue enhancing its safety management practices, adhering to the principle of "safety first" to contribute to a stable safety production environment [2].
矿建公司圆满完成2025年火灾应急救援 实战演练
Zhong Guo Neng Yuan Wang·2025-08-27 07:43