Workflow
Probe Gold Announces Infill Drilling Results with Grades Up to 20.4 g/t Au Over 5.5 Metres (cut) at Novador Project, Quebec

Core Viewpoint - Probe Gold Inc. has announced significant results from its 50,000-metre winter infill drill program at the Novador property, confirming strong continuity of mineralization and highlighting expansion potential, which will support the upcoming pre-feasibility study (PFS) [1][2]. Group 1: Drill Program Results - The infill drill program has completed 28 drill holes totaling 9,264 metres, returning significant gold intercepts from near-surface to approximately 200 metres vertical depth, with high-grade gold intercepts found deeper in the Creek deposit areas [1][2]. - Notable drill results include intercepts of 21.8 g/t Au over 2.0 metres and 40.1 g/t Au over 1.0 metre in the New zone, as well as 39.1 g/t Au over 1.0 metre in the Creek 023 zone [3][4]. Group 2: Project Development and Future Plans - The results from the drilling program will enhance 3D models and support resource conversion for the upcoming PFS, which is expected to be completed by year-end 2025 [2][4]. - The company is making progress on permitting, resource growth, and mine plan optimization, with a strong treasury supporting its commitment to developing Novador as a top-tier gold project [2][12]. Group 3: Geological Context - Mineralization along the Courvan trend is characterized by shallow-dipping East-West gold-bearing veins associated with shear zones intersecting the Bourlamaque granodiorite batholith, with gold primarily found in sulphide-bearing quartz-carbonate-tourmaline veins [8]. - The Bussiere deposit remains open laterally and at depth, indicating further exploration potential [8]. Group 4: Company Overview - Probe Gold Inc. is focused on the acquisition, exploration, and development of gold properties, owning 100% of the Novador Gold Project and controlling a large land package of approximately 1,798 square kilometres in Quebec [13]. - The Novador project hosts four past-producing mines and contains 80% of the company's gold resources in Val-d'Or East, with a robust mining plan projecting an average annual gold production of 255,000 ounces over a 12.6-year mine life [12][13].