Core Viewpoint - The company successfully executed an emergency power supply operation to ensure stable electricity for an important online meeting, achieving a "four zero" goal of zero errors, zero faults, zero power outages, and zero complaints [3][4]. Group 1: Emergency Response - An urgent notification was issued for emergency power supply and UPS support for a critical meeting regarding the creation of a national-level high-tech zone [1][3]. - The meeting was initially planned to be in-person but was changed to an online format due to significant activities in Beijing [3]. Group 2: Challenges Faced - The power supply team encountered significant challenges, including outdated equipment in the 2012-built committee building and complex low-voltage wiring that made it difficult to assess connections [3]. - The meeting room was undergoing critical equipment adjustments, preventing the use of standard testing methods to identify important load switch positions [3]. Group 3: Innovative Solutions - The power supply team implemented a "dual-line parallel" solution to expedite the connection of emergency power and UPS equipment while minimizing disruption to the building's operations [3][4]. - Experienced technicians meticulously mapped out the low-voltage distribution room's cables to accurately locate similar switches in the high-voltage distribution room, reducing the scope of power outages [3]. Group 4: Successful Execution - The emergency power preparation was completed by 1:45 AM, following a five-hour intensive operation [4]. - The meeting proceeded smoothly the next day, supported by stable electricity, fulfilling the company's commitment to high-quality development and urban construction in the region [4].
深夜攻坚!溧阳供电5小时紧急护航高新区冲刺“国家级”
Yang Zi Wan Bao Wang·2025-08-29 09:25