Core Insights - The successful completion of the first mountain tunnel of the Guozi Pass pipeline marks a significant breakthrough for the West-to-East Gas Transmission project, enhancing the overall safety and risk resilience of the pipeline system [1][2] Group 1: Project Overview - The Guozi Pass pipeline is a key energy infrastructure project located in the Ili Kazakh Autonomous Prefecture of Xinjiang, with a designed annual gas transmission capacity of 60 billion cubic meters [1] - The project involves the construction of a 32-kilometer long pipeline using a dual-pipe system, which will operate in conjunction with existing pipelines to improve safety [1] Group 2: Engineering Achievements - The project features four long-distance mountain tunnels, achieving multiple industry records, including the longest single excavation length of 6,612 meters and the largest cross-section size of 6,870 millimeters [1] - It is the highest tunnel project at an elevation of 2,005 meters and has the largest elevation difference of 324 meters, as well as the steepest slope of 10.61% [1] Group 3: Environmental Considerations - The project is located in an ecologically sensitive area with a forest coverage rate of 53% and is home to 146 species of terrestrial vertebrates [2] - To minimize environmental impact, the company has implemented optimized route design and innovative technologies, including a tunnel drainage treatment system and comprehensive dust control measures [2]
西部油气能源大通道获重要突破
Ke Ji Ri Bao·2025-09-02 06:33