Core Viewpoint - The State Grid Tibet Electric Power is transitioning its focus to autumn inspection and pre-test work starting in September, with a comprehensive plan to ensure the stable operation of the power grid during the winter peak season [1] Group 1: Autumn Inspection and Maintenance - The autumn inspection period will last until the end of November, involving 487 maintenance and pre-test tasks with over 2,700 personnel deployed [1] - The company is facing multiple challenges, including the simultaneous maintenance of important inter-provincial connections and the need to manage various levels of grid risks [1][3] Group 2: Safety and Risk Management - The company adheres to a "plan first" principle in safety management, implementing strict operational plans and enhancing safety measures for high-risk operations [3] - A "weekly control, monthly report" mechanism has been established for hidden danger management, focusing on the rectification of 21 overloaded main transformers and clearing tree obstacles along power lines [5] Group 3: Seasonal Preparations - Preparations for the winter peak season include inspections for floating debris and fire hazards, as well as maintenance checks on insulation and firefighting facilities at substations [6] - The company is also ensuring the safety of waterworks at power plants and maintaining water reserves, while enhancing emergency support in key areas like Ali and Naqu [6]
国网西藏电力全面启动秋检预试 精准施策筑牢冬季电网安全防线
Zhong Guo Neng Yuan Wang·2025-09-03 09:46