又一湾区枢纽来了!深圳5线换乘枢纽环评公示,规划细节曝光
Nan Fang Du Shi Bao·2025-09-03 11:03

Core Viewpoint - The Shenzhen Fivehe Comprehensive Transportation Hub project aims to enhance connectivity within the Greater Bay Area, serving as a crucial interchange for multiple rail lines and improving access to surrounding cities [1][2]. Group 1: Project Overview - The Fivehe Hub is located at the geometric center of Shenzhen, serving as an interchange for Metro Lines 5 and 10, with future connections to the Shenzhen-Da University, Shenzhen-Huizhou, and Shenzhen-Guangzhou intercity lines [1]. - The project includes comprehensive engineering works, supporting infrastructure, and renovations of existing metro lines [2]. Group 2: Engineering Details - The hub will consist of four underground levels, with various functionalities including intercity station platforms, metro station platforms, and public concourse areas [2]. - The design incorporates a central atrium that connects all levels, enhancing the spatial experience and functionality of the underground area [2]. Group 3: Passenger Flow Forecast - Initial passenger flow is projected at 156,840 daily trips in 2028, increasing to 202,822 by 2035, and reaching 235,204 by 2050 [3]. - Peak hour traffic is expected to rise from 21,216 passengers initially to 34,104 in the long term [3]. Group 4: Project Timeline and Investment - The total construction period for the project is estimated at 24 months, with a total investment of approximately 201.55 million yuan [4].