Workflow
中国水利水电第五工程局有限公司违规被罚
Qi Lu Wan Bao·2025-09-05 01:23

Core Points - The article discusses an administrative penalty imposed on China Water Resources and Hydropower Fifth Engineering Bureau Co., Ltd. for failing to conduct safety briefings before a construction project [1][2] - The penalty was issued by the North China Energy Regulatory Bureau, with a fine of 100,000 RMB due to safety management failures [1][2] Company Overview - China Water Resources and Hydropower Fifth Engineering Bureau Co., Ltd. is a key subsidiary of China Power Construction Group, which is ranked 100th in the 2022 Fortune Global 500 and 1st in the ENR "Top 150 Global Engineering Design Firms" [2] - The company holds various qualifications, including special-grade for water conservancy and hydropower construction, and has a registered capital of 1.991 billion RMB [2] - It operates with over 9,300 pieces of equipment, employs around 6,700 staff, and has total assets exceeding 23 billion RMB, with an annual marketing volume over 50 billion RMB and construction capacity exceeding 30 billion RMB [2]