Core Viewpoint - The successful completion of the hot sliding test for the Panxiong High-speed Railway marks a significant milestone, indicating that the line is ready for further testing and eventual operation, which will enhance regional connectivity and economic development in Guizhou Province [1] Group 1: Project Details - The hot sliding test was conducted on September 5, with the test train arriving at Guizhou Xingyi South Station, confirming that the railway line meets basic operational conditions [1] - The test involved the train operating at low, medium, and high speeds, with all parameters and performance indicators meeting expected standards, and the traction power supply system passing inspection [1] Group 2: Economic and Regional Impact - The Panxiong High-speed Railway is the final project needed for Guizhou Province to achieve its goal of "high-speed rail access to every city," significantly reducing travel time from Guiyang to Xingyi to 2 hours [1] - The completion of this railway will create a high-speed rail traffic circle of 1 to 2 hours connecting Guiyang to eight central cities in the province, which is crucial for improving the regional railway network and promoting local economic development [1]
盘兴高铁完成热滑试验
Xin Hua Wang·2025-09-05 06:15