Core Viewpoint - Jin控电力's Tashan Phase III 2×1000 MW coal power project has been approved by the Shanxi Provincial Development and Reform Commission, indicating a significant step in the company's expansion in the coal power sector [1]. Company Summary - The project involves the construction of 2×1000 MW ultra-supercritical, air-cooled coal-fired generating units along with auxiliary facilities, which will include desulfurization and denitrification systems [1]. - The designed standard coal consumption for the project under pure condensing conditions is 282.8 gce/kWh, with an annual coal consumption of 3.689 million tons [1]. - The project plans to connect to the grid at a voltage level of 500 kV, with specific plans to be determined later [1]. Industry Summary - The approval of this project reflects ongoing investments in coal power generation within the region, highlighting the continued reliance on coal as an energy source despite global trends towards renewable energy [1].
晋控电力(000767.SZ):塔山三期2×100万千瓦煤电项目获得核准