Core Viewpoint - The launch of the G25 Changshen Expressway charging station in Zhejiang represents a significant advancement in the province's electric vehicle charging infrastructure, showcasing the integration of renewable energy and smart charging technologies. Group 1: Charging Infrastructure Development - The G25 Changshen Expressway charging station features 108 high-power fast charging piles, with 40 supercharging piles capable of reaching a maximum power of 600 kW, enabling a charging speed of nearly "1 second for 1000 meters" [1] - The station can meet the efficient charging needs of over 3000 electric vehicles daily, promoting connectivity in the core intercity green corridor of the Yangtze River Delta [1] - As of now, Zhejiang has built 433 charging stations and 2645 charging piles on its expressways, achieving full coverage of charging facilities across the province [2] Group 2: Integration of Charging and Tourism - The Ma Station tourism distribution center has been developed as a comprehensive demonstration project combining charging and cultural tourism, featuring 178 public charging piles with a maximum power of 30 kW [3] - The center allows users to charge their vehicles while enjoying local culture and shopping, enhancing the overall travel experience [3] Group 3: Social Charging Resource Development - A strategic partnership between State Grid (Shaoxing) Electric Vehicle Service Co., Ltd. and Zhejiang Jinggong Power Technology Co., Ltd. aims to connect over 1600 social charging piles to the State Grid E-charging platform, marking the largest single-enterprise connection in Zhejiang [4] - This initiative is expected to provide over 500,000 charging services annually for electric vehicle users, significantly improving the efficiency of social charging resource utilization [4]
浙江构建智能充电服务网络