Workflow
Q2 Metals Drills 457 Metres of Continuous Spodumene Pegmatite, Widest Interval to Date at the Cisco Lithium Project in Quebec, Canada
Q2 Q2 (US:QTWO) Globenewswireยท2025-09-10 08:57

Core Viewpoint - Q2 Metals Corp. has reported significant progress in its summer 2025 infill drilling campaign at the Cisco Lithium Project, highlighting multiple wide intercepts of spodumene pegmatite, which indicates strong potential for lithium mineralization [2][3][5]. Drilling Results - The Summer Drill Program involved eight holes drilled over a total of 4,603 meters, all of which intercepted pegmatite with visual indications of spodumene mineralization [3][4]. - Notable drill hole results include: - Hole CS25-044 with a continuous intercept of 457.4 meters [4][5]. - Hole CS25-038 encountered 22 spodumene pegmatite intervals, including a 58.9-meter wide interval [5]. - Hole CS25-039 had 13 intervals, with the widest being 108.5 meters [5]. - A total of 46 holes have been drilled to date, amounting to 20,138 meters, with assays pending for the summer campaign [5]. Mineral Resource Potential - The Cisco Project has an Exploration Target estimating potential mineralization of 215 to 329 million tonnes at a grade ranging from 1.0% to 1.38% Li2O, based on the first 40 holes drilled [11][29]. - The mineralized zone spans approximately 1.5 kilometers in northeast-southwest direction, with ongoing drilling aimed at refining the model and defining an initial inferred Mineral Resource estimate [10][20]. Future Plans - The company plans to continue its drilling campaign into the fall and winter, focusing on infill drilling within the main mineralized zone and testing additional outcrop zones [20][30]. - Three drill rigs are currently operational, emphasizing the commitment to advancing the exploration and resource estimation process [5][20]. Company Overview - Q2 Metals Corp. is a Canadian mineral exploration company focused on the Cisco Lithium Project, which consists of 801 claims covering 41,253 hectares in Quebec, Canada [28][29]. - The project is strategically located 6.5 km from the Billy Diamond Highway, facilitating access to infrastructure [28].