Core Insights - Gold X2 Mining Inc. has announced positive initial assay results from its grade control drill program at the Moss Gold Project, indicating higher gold grades than previously predicted in the resource model [1][2] - The ongoing drilling program aims to enhance the resource classification from inferred to indicated and to provide samples for feasibility-level metallurgical studies [1][2] Drill Results - A total of 61 short drill holes have been completed, with the first 18 holes confirming the continuity of high-grade mineralization within the Main Zone [5] - Significant drill intercepts include: - 50.85m of 2.18 g/t Au from 1.15m in hole MMD-25-203 - 49.85m of 1.54 g/t Au from 0.7m in hole MMD-25-201, including 36.3m of 2.03 g/t Au - 20.25m of 2.73 g/t Au from 147.0m in hole MMD-25-215, including 9.7m of 5.35 g/t Au [5][6] Geological Insights - The drilling has confirmed the geological model, with observed continuity of shear zones supporting the resource estimation process [2][12] - The mineralized intersections are characterized by moderate to strong shearing and alteration, indicating robust geological continuity [12][13] Technical Overview - The drill program is designed with a 12.5-meter diamond-shaped spacing pattern to ensure mining-level precision [11] - The results are being compared against the current resource model, showing that the drilling has intersected slightly narrower but higher-grade shears than predicted [14][22] Quality Control Measures - The company has implemented a quality control program for all samples collected, designed by an independent third party to ensure analytical quality [26] - Samples were sent to ALS Geochemistry for preparation and analysis, with strict adherence to industry standards for quality assurance [24][26]
Gold X2 Intersects up to 50.85m of 2.18 g/t Au from 1.15m in Moss Main Zone Grade Control Drilling Program
Newsfile·2025-09-10 11:00