Core Insights - Shandong's power grid has faced extreme challenges this summer, with electricity load reaching a record high of 130.21 million kilowatts, reflecting the broader national trend of increasing electricity demand due to high temperatures [1][2] Group 1: Power Supply and Demand Management - The "three pillars" of power supply in Shandong—new energy, external electricity, and conventional power—have effectively collaborated to manage the peak load of 130 million kilowatts [2][5] - Shandong's new energy output and grid load have both reached new highs, with external electricity imports exceeding 30 million kilowatts for the first time, marking a 24% year-on-year increase [2][4] - The implementation of a "double zero" management strategy for thermal power units has expanded to 600,000 kilowatts, ensuring reliable power supply during peak times [5] Group 2: Infrastructure and Technological Advancements - The construction of a world-class UHV (Ultra High Voltage) grid has been accelerated, with the completion of the first "wind-solar-fire-storage integrated" UHV project in the country [6][7] - The accuracy of load forecasting reached 99.4%, and new energy forecasting accuracy was 98.4%, both showing a year-on-year improvement of 1.5 percentage points [6] - The use of advanced technologies, such as drones for inspections and intelligent predictive models, has enhanced the reliability and responsiveness of the power grid [6] Group 3: Innovative Energy Solutions - New energy storage systems and virtual power plants have played a crucial role in balancing supply and demand, with Shandong establishing 33 virtual power plants with a total capacity of 4.682 million kilowatts [10][11] - During peak demand, 144 new energy storage stations discharged a maximum power of 8.0359 million kilowatts, setting a new record for provincial grid energy storage discharge [11] - The integration of electric vehicles as "mobile power banks" through charging stations has further contributed to the flexibility of the energy supply [11] Group 4: Future Developments - The establishment of the Shandong New Power System Research Center marks a new phase in the development of innovative power systems, aiming to create more national-leading examples of new power system construction [12]
1.3亿千瓦负荷下的“无感”度夏,山东交出迎峰度夏优异答卷
Qi Lu Wan Bao·2025-09-15 09:31