Workflow
逾三千五百平方米的光伏棚每年发电超六十万度 露天停车场撑起“光伏伞”
Si Chuan Ri Bao·2025-09-16 02:25

Group 1 - The core function of the newly installed photovoltaic panels at Anju District People's Hospital is to generate electricity, which will primarily supply the hospital's daily operations and reduce electricity costs, while excess electricity can be sold back to the grid [1][2] - The parking lot has been transformed into a multifunctional charging station that integrates parking, power generation, and environmental protection [1] - A similar integrated demonstration station in the He Dong New District features a 720kW liquid-cooled ultra-fast charging technology, allowing for rapid charging and vehicle-to-grid interaction [2] Group 2 - The photovoltaic project in Suining is part of the city's broader initiative to promote energy conservation and emission reduction, as outlined in the "14th Five-Year Plan for Energy Conservation and Emission Reduction" [2] - As of July this year, Suining has installed a total of 189.7 MW of photovoltaic capacity, with an additional 83.3 MW under construction [2] - The advancements in photovoltaic technology and decreasing material costs are enabling regions with average solar resources, like Suining, to develop solar projects [2]