昌九高铁庐山城际场站场改造I级封锁施工正式启动
Yang Shi Xin Wen·2025-09-16 09:49

Group 1 - The construction of the Lushan Intercity Station on the Chang-Jiu High-Speed Railway has officially commenced, marking a critical phase in the overall project with the highest level of risk and complexity [1] - The construction will be carried out in four night shifts, involving the replacement of switches and signal interlocking adjustments, requiring a total of 22 hours of "window time" to complete essential tasks [5][7] - Upon completion of the station renovation, the Chang-Jiu High-Speed Railway will facilitate the integration with the Lushan Railway hub, allowing direct high-speed train services from Jiujiang to Guangzhou and Shenzhen, reducing travel time by approximately 10 minutes compared to the existing route [7] Group 2 - The Lushan Intercity Station is a key transportation hub on the existing Chang-Jiu Intercity Railway, with trains passing through every 3 minutes during peak hours [5] - The "I-level blockade construction" refers to the highest level of construction work on an operational railway line, which must be completed within a specified time frame to restore normal operations [5]

昌九高铁庐山城际场站场改造I级封锁施工正式启动 - Reportify