Workflow
Sitka Drills 235.9 Metres of 1.11 g/t Gold from Surface, Including 40.0 Metres of 2.01 g/t Gold and 10.0 Metres of 5.29 g/t Gold, Further Confirming a Near-Surface Higher-Grade Gold Zone at Its Rhosgobel Discovery, RC Gold Project, Yukon
Newsfileยท2025-09-18 09:00

Core Viewpoint - Sitka Gold Corp. has reported significant gold and tungsten mineralization results from its Rhosgobel discovery at the RC Gold Project in Yukon, confirming a high-grade near-surface gold zone with potential for further expansion [2][6][30]. Group 1: Gold Mineralization Results - Drill hole DDRCRG-25-010 returned 235.9 meters of 1.11 g/t gold, including 40.0 meters of 2.01 g/t gold and 10.0 meters of 5.29 g/t gold from surface, marking the best intercept to date from Rhosgobel [2][3][6]. - Drill hole DDRCRG-25-009 reported 118.0 meters of 1.09 g/t gold, including 14.0 meters of 3.34 g/t gold from surface [3][6]. - All 10 diamond drill holes completed in the Rhosgobel area have returned intercepts greater than 100 gm (g/t Aum) over a strike length of approximately 300 meters [2][3][6]. Group 2: Tungsten Mineralization Results - Significant tungsten mineralization has been identified at Rhosgobel, with intercepts including 75.50 meters of 0.132% WO3, 6.98 meters of 0.388% WO3, and 0.61 meters of 4.739% WO3 [4][18]. - The presence of tungsten as a by-product of gold production adds a compelling component to the Rhosgobel target, with further analytical procedures implemented to assess its economic significance [6][18]. Group 3: Drilling Progress and Future Plans - A total of 42 drill holes have been completed in 2025 at Rhosgobel, covering over 1.2 kilometers, with assays pending for an additional 32 holes [2][3][5]. - Approximately 32,000 meters of diamond drilling has been completed across the RC Gold Project this year, with results still pending for 62 drill holes [3][5][6]. - The Rhosgobel area remains open in all directions, indicating potential for further mineralization expansion [3][6].