IsoEnergy and Purepoint Intersect up to 8.1% U3O8 at Dorado Project

Core Insights - IsoEnergy Ltd. and Purepoint Uranium Group Inc. announced partial assay results from their joint venture Dorado Project, highlighting significant uranium grades from drill hole PG25-07A, which returned 2.1 metres grading 1.6% U₃O₈, including 0.4 metres at 8.1% U₃O₈ [1][2] Summary by Sections Assay Results - Drill hole PG25-07A reported 2.1 metres at 1.6% U₃O₈, with notable intervals including 0.4 metres at 8.1% U₃O₈ and an additional 4.9 metres at 0.52% U₃O₈, marking the most significant assay intervals from the Nova discovery zone [1][4] - The assay results reinforce the strength of the newly discovered system, providing a solid foundation for further exploration [2] Drilling Program Status - The summer drill program was curtailed due to regional wildfires, which limited helicopter access and created hazardous conditions, leading to the deferral of drilling at the nearby Celeste project [3] - A total of 5,030 metres were drilled across 11 holes before the program was cut short, with a planned total of 5,400 metres [5] Future Plans - Follow-up drilling programs are planned for early 2026, pending final assays and geological interpretations, focusing on expanding the Nova discovery and testing priority corridors across the Dorado Project [8] - The companies are awaiting full geochemical assays and structural interpretations to support detailed planning for future drilling [8] Project Overview - The Dorado Project is a 50/50 joint venture between IsoEnergy and Purepoint, covering over 98,000 hectares in the Athabasca Basin, known for its favorable geology for uranium deposition [13] - Recent drilling has confirmed the continuity of fertile graphitic rock packages, indicating potential for additional high-grade discoveries in the region [14]