Workflow
进入中海油平台拖航市场
Qi Lu Wan Bao·2025-09-19 11:09

Core Viewpoint - The successful positioning of the new Shengli Oil Engineering Company's Xinjingli No. 2 platform in the Bohai West block marks a significant expansion of the company's drilling platform towing business in the CNOOC market [1] Group 1: Company Achievements - The company has completed drilling and completion services for 20 wells across various blocks including Caofeidian, Qinhuangdao, Longkou, and Bohai South since entering the CNOOC market [1] - Seven key performance indicators (KPIs) have reached Class A drilling platform standards, and two "hundred-ton wells" have been successfully drilled [1] - The company maintained a 100% daily fee acquisition rate for four consecutive months and received two letters of commendation from the client [1] Group 2: Operational Excellence - The towing operation had a narrow time window and high precision requirements, with only one day of favorable weather forecast, and the positioning was within 3.2 meters of the production platform [1] - Prior to towing, the company conducted thorough preparations including hydrological and meteorological data collection, towing plan formulation, vessel acceptance, and system checks [1] - The operation was executed with clear personnel division, unified command, and precise execution, achieving the goals of pulling piles, towing, and positioning all on the same day, which was seven days ahead of the original plan [1]