Core Viewpoint - DRI, the EU renewables arm of Ukraine's DTEK Group, has partnered with Fluence Energy to supply battery storage units for the 133 MW Trzebinia project in Poland, which will be the largest battery storage facility in the Polish Capacity Market starting in 2027 [1][2][9]. Group 1: Project Details - The Trzebinia project will provide an energy reserve to enhance Poland's energy security, allowing for rapid dispatch during peak demand or generation drops [2][9]. - The project will utilize Fluence's Smartstack™ platform, which is designed for fast deployment and optimized performance, and will include advanced cybersecurity features [5][6][9]. - The project is part of a broader strategy by DTEK and DRI to create an interconnected energy system across Central and Eastern Europe, contributing to energy independence for Poland and the EU [7][8]. Group 2: Market Context - Poland's installed energy storage capacity is expected to grow significantly, from 25 MWh at the end of 2024 to over 20 GWh by 2030, indicating a strong market potential for energy storage solutions [8][10]. - The Polish government aims to achieve over 50% renewables in its energy mix by the end of the decade, aligning with the goals of the Trzebinia project [10]. Group 3: Company Background - DRI is focused on accelerating the energy transition in Central, Eastern, and Southern Europe, with a mission to achieve net zero goals through renewable energy and battery storage projects [11]. - Fluence Energy is a global leader in energy storage and optimization software, with a commitment to enhancing grid resilience and supporting renewable energy integration [12].
DTEK subsidiary, DRI, picks Fluence to deliver Trzebinia battery project