Workflow
DTEK subsidiary, DRI, picks Fluence to deliver Trzebinia battery project
Globenewswire·2025-09-22 06:00

Core Insights - DRI, the EU renewables arm of Ukraine's DTEK Group, has partnered with Fluence Energy to supply battery storage units for the 133 MW Trzebinia project in Poland, which will be the largest battery storage facility in the Polish Capacity Market starting in 2027 [1][2][9] Group 1: Project Overview - The Trzebinia project will provide an energy reserve to enhance Poland's energy security, allowing for rapid dispatch during peak demand or generation drops [2] - The project will utilize Fluence's Smartstack™ platform, which is designed for fast deployment and optimized performance, and will incorporate advanced cybersecurity features [5][6][9] - The project is part of a broader strategy by DTEK and DRI to create an interconnected energy system across Central and Eastern Europe [7][8] Group 2: Market Impact - Poland's installed energy storage capacity is expected to grow from 25 MWh at the end of 2024 to over 20 GWh by 2030, indicating significant market potential [8] - The integration of battery technology in the capacity market is projected to lower energy costs, as energy storage is cheaper to operate than traditional generation methods [2][3] Group 3: Strategic Importance - The Trzebinia project is crucial for Poland's goal of achieving over 50% renewables in its energy mix by the end of the decade [10] - The project also aims to enhance the grid's ability to integrate renewable energy sources, contributing to energy independence for Poland and the EU [8]