Workflow
海空口岸更便利 海南自贸港全力保封关
Zhong Guo Xin Wen Wang·2025-09-23 09:29

Core Viewpoint - The trial operation of the "second line port" (freight) centralized inspection area at Haikou New Port and South Port marks a significant step in optimizing traffic organization and improving passage efficiency for the Hainan Free Trade Port, providing strong transportation support for the island's closure operations [3][5][7]. Group 1: Port Operations - The centralized inspection area at Haikou New Port and South Port started trial operations on September 15, enhancing the efficiency of freight transport and facilitating smoother traffic flow for trucks [3][5]. - The inspection process has been streamlined, allowing truck drivers to complete the entire inspection in just over 10 minutes, significantly reducing wait times compared to previous procedures [3][5][6]. Group 2: Policy and Management - Hainan Free Trade Port has established 8 open ports and 10 "second line ports" to facilitate trade, with specific measures to ensure efficient management and operation of these ports [3][5][6]. - The port management strategy includes a "one-stop customs clearance" model, where businesses can declare goods online, allowing for coordinated operations among customs and inspection departments [6][7]. Group 3: Infrastructure and Preparation - Hainan is enhancing its port infrastructure with 22 projects aimed at upgrading inspection facilities and ensuring the interconnectivity of various trade and customs systems [7][8]. - Continuous pressure testing and optimization of the "second line ports" are planned to ensure stable, convenient, and efficient operations in preparation for the full closure of the island on December 18 [7][8].