Workflow
Pinnacle Delineates New Vein at El Potrero as Robust Epithermal System Takes Shape
Thenewswireยท2025-09-24 12:30

Core Viewpoint - Pinnacle Silver and Gold Corp. has identified a robust low sulphidation epithermal system at the Potrero project in Durango, Mexico, with significant gold-silver mineralization extending from underground to surface, particularly at the El Capulin vein, which is approximately 200 meters southwest of the Dos de Mayo vein [1][2][3]. Group 1: Mineralization and Sampling Results - Surface mapping and sampling have revealed high-grade gold-silver mineralization over a vertical distance of up to 80 meters, with notable grades of 2,280 g/t Ag and 1,444 g/t Ag at surface [2][3]. - The El Capulin vein has been traced for approximately 375 meters along strike, with grades reaching up to 6.27 g/t Au and 99 g/t Ag, indicating strong continuity of mineralization [3][6]. - The vertical extension of mineralization suggests potential for further discoveries, with mineralization possibly extending downwards to the 1500 masl level seen at Dos de Mayo [6][7]. Group 2: Project Potential and Infrastructure - The Potrero project is located in the Sierra Madre Occidental, near several operating mines, enhancing its strategic value [15][16]. - The property has significant exploration potential as it has not been systematically explored by modern methods for nearly 40 years [16]. - A previously operational 100 tpd plant on site can be refurbished for near-term production, with existing infrastructure such as road access and power lines within proximity [17][18]. Group 3: Company Strategy and Ownership - Pinnacle aims to earn an initial 50% interest in the project upon commencing production, with plans to generate cash flow for further development and increase ownership to 100% [18][20]. - The company is focused on developing precious metals projects in the Americas, with a commitment to building long-term, sustainable value for shareholders [20].