Core Viewpoint - The Xiangyang to Jingmen high-speed railway (Xiangjing High-speed Railway) will commence operations on September 28, 2023, significantly enhancing regional economic development and connectivity [1][2]. Group 1: Project Overview - The Xiangjing High-speed Railway spans 116 kilometers, connecting Xiangyang East Station to Jingmen West Station, with a design speed of 350 kilometers per hour [1]. - The railway includes three stations: Xiangyang East, Yicheng (newly built), and Jingmen West [1]. - Construction began in September 2022, with key projects like the Yicheng Hanjiang Grand Bridge and Shimen Reservoir Grand Bridge completed on schedule [1]. Group 2: Operational Details - The railway will operate up to 26 high-speed trains daily, reducing travel time from Xiangyang to Jingmen to 29 minutes, a 50-minute reduction compared to current conventional trains [2]. - Travel time from Xiangyang to Jingzhou will be reduced to 55 minutes, saving 147 minutes compared to existing routes [2]. - A flexible and differentiated pricing mechanism will be implemented to cater to various passenger needs, with ticket information available through the railway's official channels [2]. Group 3: Economic Impact - The opening of the Xiangjing High-speed Railway will enhance the high-speed rail network in the western Hubei region, facilitating better travel for local residents and promoting economic growth in surrounding areas [2]. - The railway serves as a crucial regional connector, linking with existing and upcoming high-speed rail lines, thereby contributing to the high-quality development of the Yangtze River middle urban agglomeration and the rise of central China [2].
襄阳至荆门高铁将于9月28日开通运营
Zhong Guo Xin Wen Wang·2025-09-25 03:56