Core Insights - First Atlantic Nickel Corp. has reported a significant drill hole intersection of 491 meters of visibly disseminated awaruite mineralization at the RPM Zone within its Pipestone XL Nickel Alloy Project, extending the strike length to 800 meters, which is double the length drilled during Phase 1 [1][8][6] Drilling and Mineralization - The Phase 2X drilling program is expanding the RPM Zone with long intersections of visibly disseminated awaruite mineralization, confirming continuity across three drill sections spaced approximately 400 meters apart [2] - Drill hole AN-25-08 has established an 800-meter north-south strike length at the RPM Zone, with the largest disseminated awaruite grains identified to date, reaching up to ~2,000 microns in length, which is double the previous record [6][7][8] Metallurgical Testing - Samples from Phase 2X drill holes have been submitted for whole-rock assay analysis and Davis Tube Recovery (DTR) metallurgical testing, with DTR testing returning average magnetic concentrate grades of 1.38% nickel and 1.67% chromium [3][8] - The average DTR nickel grade calculated across all reported drill holes is 0.12%, with a mass pull of 9.08% [3][8] Geological Model and Exploration - A new geological model suggests that the Pipestone Ophiolite Complex consists of laterally extensive layers of peridotites or harzburgites, with optimal drill orientation being east-dipping at angles between 45-65 degrees to better test the mineralized zones [18][19] - Initial east-dipping drill holes have intersected higher concentrations of awaruite nickel mineralization in harzburgites compared to dunites, providing a more complete profile of the deposit [20] Future Plans and Updates - The Phase 2X program aims to test beyond a 1-kilometer strike length, with multiple updates on drilling and project developments expected in the coming weeks [8][2] - The company is positioned to meet the growing demand for responsibly sourced nickel, aligning with new US Electric Vehicle requirements that stipulate no critical minerals processed by foreign entities [37][38]
First Atlantic Nickel Doubles RPM Zone Strike Length to 800 Meters at Pipestone XL Nickel Alloy Project with 491 Meter Awaruite (Ni3Fe) Intercept in Phase 2X Drilling
Globenewswireยท2025-09-25 08:30