Workflow
红河开远:光伏电站实现全容量并网发电
Xin Hua She·2025-09-26 02:27

Core Insights - The two solar power plants, Nayi (64 MW) and Xiaoshiyan (55 MW), have achieved full-capacity grid connection, contributing to Yunnan Province's "14th Five-Year Plan" for renewable energy development [1][2] - Xiaoshiyan solar power plant has a peak installed capacity of 68.2 MW and an average daily power generation of 293,300 kWh, saving 57,300 tons of standard coal and reducing CO2 emissions by 153,000 tons [1] - Nayi solar power plant has an annual average grid electricity output of 103.86 million kWh, saving 30,100 tons of standard coal and reducing CO2 emissions by 41,800 tons [2] Group 1 - The Xiaoshiyan solar power plant utilizes a "photovoltaic + ecological restoration" model, allowing for simultaneous crop cultivation and land use optimization [1] - The construction of Nayi solar power plant faced significant challenges due to steep terrain, with an average slope of about 45 degrees, requiring the use of drones for equipment installation [1] - The intelligent monitoring system in the Nayi solar power plant ensures stable and efficient power output during operation [2] Group 2 - The Xiaoshiyan solar power plant features 124,400 monocrystalline bifacial solar panels arranged to maximize sunlight absorption [1] - The design of the Xiaoshiyan project allows for dual development of agriculture and livestock, with a photovoltaic height of 2.5 meters [1] - The construction methods for both plants were adapted to local conditions to enhance efficiency and effectiveness [1][2]