Workflow
实现南北双向进出站,济南站新建北站房于9月26日启用
Qi Lu Wan Bao·2025-09-26 07:15

Core Points - The new north station building of Jinan Station officially opened on September 26, enhancing the regional transportation hub and providing a more convenient and comfortable travel experience for passengers [1][12] Group 1: Infrastructure Details - The new north station building is located on the north side of Jinan Station, with a total construction area of 41,995 square meters and a height of 28.2 meters [4] - The structure consists of one underground level and two above-ground levels, featuring advanced construction techniques such as a column-free canopy to improve space utilization and passenger comfort [4] Group 2: Operational Changes - The station now operates a "north-south dual-direction entry and exit" model, with the north station having a main entrance on the first floor and an underground entrance, seamlessly connecting to public transport and metro [8] - All arriving passengers will exit through an underground passage, allowing for smooth traffic flow on both sides of the station [8] - Initial operational adjustments include relocating 13 regular trains to platform 11 to optimize passenger distribution [8] Group 3: Impact on Transportation - The opening of the new north station building is expected to alleviate traffic pressure on the south square, improve passenger travel experiences, and promote the integration of railway stations with urban development [12]