Core Insights - China Power Construction (601669) has officially received the operational acceptance certificate for the second phase of the Lumut Balai geothermal power station project in Indonesia, marking it as the first geothermal EPC project handed over by a Chinese company overseas [1] Company Summary - The Lumut Balai Phase II geothermal power station is constructed by Shandong Electric Power Construction No. 3 Company, a subsidiary of China Power Construction, and is located in Muara Enim County, South Sumatra Province, Indonesia [1] - This geothermal power station is the largest and most technologically advanced project undertaken by a Chinese company in Indonesia, featuring systems such as transmission and transformation lines, booster stations, steam collection, and long-distance brine reinjection pipelines [1]
中企在海外首个闪蒸地热电站顺利移交