Core Points - The opening of Xuzhou Metro Line 6 Phase I marks a significant milestone in the city's transportation development and a new beginning for smart urban mobility [1][7] - The line is the first in Xuzhou to utilize GoA4 fully automated operation, covering a total length of 22.919 kilometers with 16 stations [3] - The initial configuration includes 24 trains, totaling 96 cars, with a maximum speed of 80 km/h, enhancing safety and operational efficiency through advanced technology [5] Summary by Sections - Project Overview - Xuzhou Metro Line 6 Phase I commenced construction in 2020 and officially opened for operation on September 28, 2023, after passing safety evaluations [1] - Technical Specifications - The line features 16 underground stations and connects with existing lines 1, 2, and 3 at three interchange stations [3] - The trains are composed of four-car B-type sets, with each train measuring approximately 80 meters in length [5] - Safety and Technology Enhancements - The metro system incorporates real-time online monitoring and programmable logic control units (LCU), ensuring safer and more efficient operations [5] - Impact on Urban Mobility - The integration of four metro lines enhances connectivity across the city, reflecting the aspirations for convenient urban travel and development [7]
徐州地铁6号线今日通车运营
Yang Zi Wan Bao Wang·2025-09-28 13:26