Workflow
国网临汾供电公司率先在山西省成立新基建劳模创新工作室
Zhong Guo Neng Yuan Wang·2025-09-29 09:39

Core Insights - The company is focusing on enhancing the talent pool for power grid construction and has established an innovation studio named after a labor model to address key issues in safety, quality, progress, and efficiency in infrastructure projects [3][4]. Group 1: Innovation Studio Establishment - The "New Infrastructure Labor Model Innovation Studio" consists of 41 experts and technical personnel, divided into five groups focusing on various aspects of power grid construction [3]. - The studio aims to promote advanced construction practices through a structured "354" work system, which includes three levels of organization and five driving dimensions for innovation [3][4]. Group 2: Technological Advancements - The studio has been actively engaged in various innovative practices, including the application of prefabricated and modular technologies, which are becoming increasingly mature [4]. - The studio has already supported two major power transmission and transformation projects and over 280 distribution network projects, with an expected maximum production capacity of 12,000 cubic meters by the end of the year, translating to an estimated annual output value of approximately 30 million yuan [5]. Group 3: Future Directions - The studio plans to conduct research on eight projects, including an "AI Cost Estimation Review System," to drive new productive capabilities and support the development of a modern power grid construction system with regional characteristics [5].