Core Insights - The flood forecasting period for major rivers in China has been extended from 3 days to 10 days, enhancing the country's flood management capabilities [1][3] - The Ministry of Water Resources is focusing on the construction of a digital twin water conservancy system, which includes digital twin basins, water networks, and engineering projects, to improve flood prevention and water resource management [1][3] Group 1: Digital Twin Water Conservancy System - The digital twin system aims to enhance monitoring, mathematical modeling, and business applications within the water conservancy sector [3] - A comprehensive "sky-ground-water-engine" integrated monitoring system has been established to improve the perception of physical water objects, providing real-time information for risk monitoring and control [3] - The development of high-fidelity digital flow field simulation models supports decision-making for flood and drought disaster prevention and unified scheduling of water projects [3] Group 2: Practical Applications and Achievements - The digital twin platform has successfully supported the management of significant floods, including the largest flood in the Beijiang River since 1915 and the major flood in the Haihe River basin [3] - Monitoring and early warning systems have been implemented for 268 key river and lake ecological flow control sections across the country [3] - The digital twin system for the South-to-North Water Diversion Project provides real-time reflections of project conditions, optimizing scheduling and ensuring safety in water supply and quality [3]
水利部答一财:推进数字孪生水利体系建设
Di Yi Cai Jing·2025-09-29 02:54