Core Insights - Jiangsu Yancheng has become the first city in the Yangtze River Delta to exceed 20 million kilowatts of renewable energy grid capacity, reaching a total of 20.34 million kilowatts with the recent integration of the second batch of units from the Guoxin Dafeng 850,000-kilowatt offshore wind power project [1] Group 1: Renewable Energy Capacity - The renewable energy grid capacity in Yancheng consists of 48% wind power and 51% photovoltaic power [1] - The total renewable energy generation in Yancheng from January to August this year reached 24.55 billion kilowatt-hours [1] Group 2: Transmission Infrastructure - Jiangsu has established a total of 8 cross-river transmission channels with a combined transmission capacity of nearly 25 million kilowatts [1] - The maximum daily "green electricity" transmission capacity is expected to exceed 350 million kilowatt-hours by the summer of 2025 [1]
盐城新能源并网规模超2000万千瓦
Zhong Guo Hua Gong Bao·2025-09-30 06:45