Aton Reports Final Results from The Abu Marawat Diamond Drill Programme, Including 39.55 G/T Gold And 161 G/T Silver Over 3.90 Metres from The JVZ Structure, And 9.63 G/T Gold And 86.5 G/T Silver Over 17.70 Metres from the CVZ
Core Insights - Aton Resources Inc. has provided an update on the final results from its diamond drilling program at the Abu Marawat deposit in Egypt [1] Summary by Sections - The final results include data from the last 19 holes of the 2024-25 diamond drilling program, specifically holes AMD-196 to AMD-213, along with a re-entry of hole AMD-102 [1]