Core Viewpoint - The successful positioning of the Victory No. 9 (CNOOC Hai 8) drilling platform at the CB22FB well group marks a significant advancement in offshore production capacity for the company, despite the complex operational challenges faced during the towing and positioning process [1] Group 1 - The drilling platform has commenced side drilling operations at the CB22FB well group [1] - The operational area for the towing and positioning is noted to be complex, presenting significant challenges [1] - The company has collaborated closely with relevant departments to optimize the positioning plan and ensure strict compliance with operational approvals [1] Group 2 - There is a strong emphasis on monitoring weather changes and enhancing on-site safety supervision during the operation [1] - The overall effort is directed towards advancing offshore production capacity in the Shengli Oilfield [1]
海洋采油厂全力推进海上产能建设
Qi Lu Wan Bao Wang·2025-10-03 02:23