Workflow
Heliostar Drills 88 m Grading 8.82 g/t Gold in Resource Conversion Drilling and Adds Third Drill Rig at Ana Paula
Newsfileยท2025-10-06 10:30

Core Viewpoint - Heliostar Metals Ltd. is advancing its drilling program at the Ana Paula project in Mexico, aiming to convert inferred resources into higher confidence classifications and support a feasibility study for future production [3][4]. Drilling Program - The company has initiated a 15,000 metre drill program at the Ana Paula project, with the addition of a third drill rig to accelerate the process [3][5]. - A total of 24 holes have been completed, amounting to 6,529 metres drilled to date, focusing on defining the High Grade Panel [5][14]. - The drilling approach has been modified to enhance the identification of continuous and higher-grade gold mineralization [5]. Drill Results Summary - Significant drill results include hole AP-25-329, which returned an interval of 88.05 metres grading 8.82 grams per tonne (g/t) gold, with notable intercepts of 35.5 metres grading 13.03 g/t gold [7][9]. - Hole AP-25-327 also showed promising results, including 21.7 metres grading 2.75 g/t gold and 14.3 metres grading 4.19 g/t gold [7][9]. - Geotechnical holes AP-25-326 and AP-25-328 returned results in line with expectations, supporting mine development planning [10]. Future Plans - The company plans to make a construction decision for the Ana Paula project based on the feasibility study, targeting production of 100,000 ounces of gold per year by 2028 [4][14]. - Additional drill results are expected to be released in early November, with ongoing drilling focused on the less well-defined western edge of the High Grade Panel [14]. Company Overview - Heliostar Metals Ltd. operates gold mining projects in Mexico, including the La Colorada and San Agustin mines, and has a portfolio of development projects in both Mexico and the USA [20].