Workflow
Green Bay Copper-Gold Project, Canada: Exceptional high-grade copper and gold results pave the way for a significant Mineral Resource Estimate update this quarter
Globenewswireยท2025-10-08 22:00

Core Insights - FireFly Metals Ltd is advancing an aggressive drilling strategy at the Green Bay Copper-Gold Project, utilizing eight diamond rigs to enhance resource growth and upgrade Inferred Resources to Measured and Indicated categories [2][3][4] - Recent infill drilling results have shown high-grade mineralization, with grades reaching nearly 20% CuEq, indicating strong continuity and potential for significant resource upgrades in the upcoming Mineral Resource Estimate [5][7][12] Drilling Campaign - A six-rig underground drill campaign is focused on both resource growth and upgrading Inferred Resources to more valuable Measured and Indicated categories [4][18] - The current Mineral Resource Estimate for Green Bay stands at 24.4 million tonnes at 1.9% for 460,000 tonnes CuEq in Measured and Indicated Resources, and 34.5 million tonnes at 2.0% for 690,000 tonnes CuEq in Inferred Resources [7][12] High-Grade Results - Recent infill drilling has returned exceptional results, including: - 4.4m at 19.5% CuEq (3.1% Cu & 19.2g/t Au) in hole MUG25-113 - 10.1m at 10.1% CuEq (6.6% Cu & 4.1g/t Au) in hole MUG25-110 - 8.0m at 8.6% CuEq (3.2% Cu & 5.8g/t Au) in hole MUG25-068 [5][6][39] Financial Position - FireFly has a strong balance sheet with approximately A$145 million in cash and liquid investments, following a successful equity raise, which will support ongoing exploration and feasibility studies [14][9] Regional Exploration - Regional exploration programs are actively underway, with drill rigs testing geophysical anomalies in the central Green Bay leases and a VTEM survey being conducted over the adjacent Tilt Cove Project [13][14]