Workflow
东营经开区宏益热力自10日起注水试压
Qi Lu Wan Bao Wang·2025-10-10 02:59

Core Viewpoint - The company Hongyi Heating is preparing for the upcoming heating season by conducting water pressure tests and cold operation of its heating facilities starting from October 10, 2025, to ensure the safety and stability of the heating system [1]. Group 1: Preparation for Heating Season - Hongyi Heating plans to begin water pressure testing and cold operation of heating stations and pipeline systems in its service area as part of the preparations for the 2025-2026 heating season [1]. - The water pressure testing is a necessary step before the official heating season, combining summer maintenance with pressure testing to ensure all heating facilities meet safety operation conditions [1]. - This testing serves as a comprehensive inspection of the system, allowing for the identification and rectification of potential issues, thereby laying a solid foundation for stable heating [1]. Group 2: Monitoring and User Guidance - Residents are advised to monitor their indoor heating facilities for any leaks and to avoid unauthorized modifications or drainage of the heating system [2]. - For residents who do not require heating this season, it is recommended to keep the main valve of the heating pipeline closed and to contact the service team to close the outdoor control valve to prevent unnecessary losses [2]. - In case of any leaks in indoor heating facilities, residents should shut off the main supply and return valves and contact the heating service hotline for immediate assistance [2].