Core Insights - The State Grid Chongqing Electric Power Company successfully completed the power supply guarantee tasks for the National Day and Mid-Autumn Festival in 2025, ensuring stable electricity supply and safe operation of the power grid during the holidays [1] Group 1: Power Supply Performance - During the holiday period, the average maximum temperature in Chongqing was 30.29 degrees Celsius, an increase of 9.64 degrees Celsius compared to last year [1] - The peak load of the power grid reached 18.86 million kilowatts on October 8, a year-on-year increase of 18.32% [1] - The cumulative electricity consumption was 27.05 billion kilowatt-hours, representing a year-on-year increase of 17.73% [1] Group 2: Inspection and Maintenance - The company established a "three-dimensional" inspection system using drones and intelligent inspection robots to conduct special inspections on key substations, power distribution lines, popular tourist attractions, and transportation hubs, ensuring zero power supply failures [2] - Employees conducted night inspections with flashlights and infrared thermometers to identify potential safety hazards in equipment, ensuring stable operation [4] Group 3: Charging Infrastructure - During the holiday period, the charging volume on Chongqing's highways reached 2.5079 million kilowatt-hours, a year-on-year increase of 26.66%, with an average daily charging volume 3.3 times higher than usual [8] - The highest charging volume occurred on October 1, reaching 399.6 thousand kilowatt-hours, with over 20,000 charging sessions [8] - As of the end of September, Chongqing had built 1,602 charging stations with over 2,833 fast charging guns [8] Group 4: Emergency Response - The company set up 354 emergency repair stations and arranged 368 repair teams with 3,260 personnel, 765 engineering vehicles, and 321 generators to ensure rapid response to faults and reliable power supply [8]
国网重庆电力圆满完成国庆中秋期间保电任务
Zhong Guo Neng Yuan Wang·2025-10-10 10:18