Workflow
全国铁路实行新列车运行图 这些车次有调整
Yang Shi Xin Wen Ke Hu Duan·2025-10-11 00:38

Group 1 - The new train operation schedule implemented nationwide includes over 13,000 scheduled passenger trains and more than 23,000 freight trains [1][3] - Significant adjustments have been made to passenger train services, including the introduction of 64 high-speed trains from Shenyang to Changbai Mountain, and reduced travel times for routes connecting Beijing to Fushun, Tonghua, and Changbai Mountain [1][2] - The new schedule also features the expansion of the Fuxinghao high-speed trains, with regular operations at speeds of 350 km/h on key routes such as Hangzhou East to Changsha South and Beijing to Shenyang [2] Group 2 - The number of freight trains has increased to over 23,000, with 208 rapid freight trains operating across railway bureaus, an increase of 15 trains compared to the previous schedule [3] - New intercity trains have been added, bringing the total to 130, along with 173 multi-modal transport trains, which is an increase of 28 trains from the previous schedule [3] - Key freight corridors such as the Jingjiu and Ge'ku railways have seen an increase of 24 freight trains, enhancing winter coal supply transportation capabilities [3]