Core Viewpoint - The flood situation in Nanning, Guangxi is under control, with water levels in the Yujiang River gradually decreasing and the stability of the embankment being maintained [1][2]. Group 1: Emergency Response Measures - On October 9, over 1,500 personnel, 650 vehicles, and 2,000 tons of materials were mobilized for emergency response at the North University Bridge site, employing various strategies such as dynamic material transport and sandbag construction to address the flood threat [2]. - By 10 PM on October 9, the emergency team successfully blocked the seepage channel, significantly enhancing the overall stability of the embankment during the peak of the flood [2]. - Continuous monitoring of flow rates and surrounding hazards is being conducted as part of the ongoing emergency response efforts [2]. Group 2: Equipment and Technology Utilization - Advanced rescue equipment, including amphibious excavators and power ferry bridges, has been deployed to facilitate rescue operations and transport heavy equipment and materials via water routes [4][5]. - The use of amphibious excavators allows for excavation operations on water surfaces, aiding in clearing and creating access for rescue teams [4][7]. Group 3: Progress and Predictions - As of October 10, over 2,500 cubic meters of sand and gravel have been filled to reinforce the embankment, with core issues being largely resolved [6]. - The Nanning Hydrological Center predicts that the water level at the Yujiang Nanning Hydrological Station will drop to 74.9 meters by October 11 and further to the warning level of 73.0 meters by October 12 [6].
救援利器集结 广西郁江南宁段工况稳定风险可控
Zhong Guo Xin Wen Wang·2025-10-11 02:50