Workflow
全国铁路第四季度列车运行图实行
Yang Shi Xin Wen·2025-10-11 07:37

Core Points - The national railway system is implementing a new train operation schedule starting today, with plans to operate over 13,000 passenger trains daily [1] - The fourth quarter schedule aims to maximize the transportation potential of newly opened lines, significantly reducing travel times between key cities [1][2] - The freight train operation is also set to exceed 23,000 trains daily, enhancing railway freight capacity, service quality, and operational efficiency [2] Passenger Train Operations - The new schedule includes 64 high-speed trains from Shenyang to Changbai Mountain, and significant reductions in travel times for routes connecting Beijing to Fushun, Tonghua, and Changbai Mountain [1] - The operation of high-speed trains will connect major cities in Liaoning and Jilin provinces, with two trains each from Shenyang North to Shenyang North and Changchun West to Changchun [1] - The Fuxinghao trains will operate at a speed of 350 km/h on the Hangzhou East to Changsha South and Beijing to Shenyang routes, with 46 and 57 trains scheduled respectively [1] Freight Train Operations - The new freight train schedule optimizes the operation of 208 rapid freight trains across railway bureaus, increasing the number by 15 [2] - Intercity freight trains have been increased to a total of 130, with additional multi-modal transport trains reaching 173, an increase of 28 [2] - The speed of freight transport is expected to rise from 90 km/h to 120 km/h, reducing transport time by approximately 20 hours [2] - Key freight corridors such as the Jingjiu and GeKu railways will see an increase of 24 freight trains, enhancing winter coal supply transportation capabilities [2] - The China-Europe and China-Central Asia freight trains will maintain their operational scale, with 93 and 57 scheduled routes respectively [2]