Core Points - The new train operation schedule implemented nationwide starting today includes over 13,000 scheduled passenger trains and more than 23,000 freight trains [1][2] Group 1: Passenger Train Adjustments - The new schedule includes adjustments to passenger trains, with specific details available through channels like the railway 12306 [2] - High-speed trains such as the Shenyang to Changbai Mountain route will operate 64 trains, significantly reducing travel time between major cities in Liaoning and Jilin provinces [3] - The Chongqing East to Qianjiang segment of the Yuxia High-speed Railway will have 54 trains, enhancing connectivity between western cities and central-southern cities [3] Group 2: Freight Train Operations - The number of freight trains scheduled has increased to over 23,000, with 208 fast freight trains operating across railway bureaus, an increase of 15 trains compared to the previous schedule [2] - Key freight corridors like the Jingjiu and GeKu railways will see an additional 24 freight trains, while heavy-load railways will increase the operation of 10,000-ton trains to enhance winter coal supply transportation [4] - The China-Europe and China-Central Asia freight trains maintain their operational scale, with 93 and 57 scheduled routes respectively, and a weekly operation of 17 trains to improve logistics quality and efficiency [4]
今起 这些铁路车次有变化!
Zhong Guo Zheng Quan Bao·2025-10-11 10:48