Group 1 - B2Gold Corp. has achieved commercial production at its Goose Mine in Nunavut, Canada, as of October 2 [1][2] - The internal criteria for commercial production required 30 consecutive days with an average mill throughput of at least 65% of the design capacity, which is 4,000 tons per day (tpd) [2] - The mill recorded an average throughput of 2,652 tpd from September 3 to October 2, achieving exactly 66% of the design capacity [2] Group 2 - Following the integration of a supplemental mobile crusher, the mill's average throughput increased to 3,249 tpd from September 19 to October 2, which is 81.2% of design capacity [3] - B2Gold anticipates that the mill will operate near the 4,000 tpd design capacity throughout Q4 2025, with mill feed shifting to the Umwelt deposit [3] - Expected grades for the Umwelt deposit are projected to average between 6.5 and 7 grams per tonne of gold [3] Group 3 - B2Gold Corp. operates multiple mines, including the Fekola Mine in Mali, the Masbate Mine in the Philippines, and the Otjikoto Mine in Namibia [4]
Is B2Gold Corp. (BTG) One of the Cheap Stocks to Buy for the Next 5 Years?